DFT
Manufacturing-test readiness
Design-for-test engineering integrated into the silicon lifecycle.
Start with the engineering problem.
Choose the situation closest to your program to see the engineering impact, AionSi contribution and appropriate engagement path.
01Customer situationDFT readiness is becoming a silicon schedule constraint.
Specialist Engineering↓
DFT readiness is becoming a silicon schedule constraint.
Scan, ATPG and coverage closure must progress alongside implementation.
Test architecture, scan, ATPG and DFT sign-off support.
Specialist Engineering
02Customer situationDFT workstreams need defined execution and closure ownership.
Managed Workstream↓
DFT workstreams need defined execution and closure ownership.
Pattern generation, debug and sign-off activities compete with core design milestones.
Managed DFT workstream from planning through sign-off.
Managed Workstream
03Customer situationMultiple silicon programs need scalable DFT execution.
Dedicated Engineering ODC↓
Multiple silicon programs need scalable DFT execution.
Program teams need repeatable methodology and capacity.
Dedicated DFT engineering aligned to the product roadmap.
Dedicated Engineering ODC
Evidence before claims.
Explore approved technical material supporting the engineering capability represented on this page.
Validate capability depth with technical evidence.
Move from capability → evidence → engineering conversation without relying on unsupported customer claims.
Start focused. Expand with the program.
AionSi can enter through a focused engineering need and scale as scope, trust and roadmap requirements grow.
Bring the engineering problem.
Share the program stage, bottleneck and required engineering capacity. We can map the requirement to the appropriate AionSi engineering model.