AionSi — Driven by Commitment
03ENGINEERING CAPABILITY

Physical Design

Signoff-ready implementation

Physical implementation, timing closure and physical verification across complex silicon programs from netlist through sign-off.

FloorplanningPlacementCTSRoutingPrimeTime STACalibre / ICV
01Netlist
02Floorplan
03Placement / CTS
04Routing
05Timing / PV closure
06Sign-off

Start with the engineering problem.

Choose the situation closest to your program to see the engineering impact, AionSi contribution and appropriate engagement path.

01
Customer situation

Timing or congestion closure is constraining implementation.

Managed Workstream
Engineering impact

Late-stage ECOs and physical interactions threaten milestones.

AionSi contribution

Floorplanning, placement, CTS, routing, timing and congestion closure.

Engagement model

Managed Workstream

Discuss Your Engineering Requirement →
02
Customer situation

Advanced-node implementation needs additional physical-design capacity.

Specialist Engineering
Engineering impact

Internal teams are overloaded across implementation and sign-off.

AionSi contribution

Specialist physical implementation and sign-off engineering.

Engagement model

Specialist Engineering

Discuss Your Engineering Requirement →
03
Customer situation

Several programs require sustained backend execution capacity.

Dedicated Engineering ODC
Engineering impact

Scaling internal teams increases coordination and hiring overhead.

AionSi contribution

Dedicated Physical Design engineering ODC aligned to the customer roadmap.

Engagement model

Dedicated Engineering ODC

Discuss Your Engineering Requirement →
FloorplanningPlacementCTSRoutingPrimeTime STACalibre / ICV
01Implementation closure
02Timing and congestion recovery
03Physical verification readiness
04Sign-off-focused handoff

Validate capability depth with technical evidence.

Move from capability → evidence → engineering conversation without relying on unsupported customer claims.

Bring the engineering problem.

Share the program stage, bottleneck and required engineering capacity. We can map the requirement to the appropriate AionSi engineering model.

Discuss Your Engineering Requirement